Grade Separation (1)
| Grade Separations (Existing) |
| Grade Separations (Proposed) |
Proposed City (2)
| Primary Arterial (Proposed) 120' R.O.W. |
| Secondary Arterial (Proposed) 90' R.O.W. |
| Collector Street (Proposed) 75' R.O.W. |
Proposed County (3)
| Primary Arterial (Proposed) 120' R.O.W. |
| Secondary Arterial (Proposed) 90' R.O.W. |
| Collector Street (Proposed) 75' R.O.W. |
Streets (4)
| FREEWAY/EXPRESSWAY |
| PRIMARY ARTERIAL |
| SECONDARY ARTERIAL |
| COLLECTOR STREET |
| LOCAL STREET |
Airport_ROW (5)
Bike and Trail Network (7)
| Existing, Shared Use Path |
| Existing, Side Path |
| Proposed, Bicycle Boulevard |
| Proposed, Bike Lane |
| Proposed, Buffered Bike Lane |
| Proposed, Parking Protected Bike Lane |
| Proposed, Protected Bike Lane |
| Proposed, Shared Use Path |
| Proposed, Side Path |
Intersection Recommendations (8)
Sidewalk Gaps (9)
TxDOT Annual AADT Traffic Counts (11)
TxDOT 2022 Counts (12)
Bus Stop Red South (14)
Bus Stop Red North (15)
Bus Stop Blue South (16)
Bus Stop Blue North (17)
Bus Stop Green South (18)
Bus Stop Green North (19)
Mile Markers (20)
|